Which officer who can draw money either by bills or cheque |
|---|
Who will help the secretary in exercising effective control over maintenance of account |
Who is the professional head of the department and responsible to government of efficient working |
Who can provide prompt technical guidance and tighter & closer inspection and supervision ensuing both quality & progress of work |
Who will perform the duties as a Adviser to the govt in legal matters |
Which authority responsible for the control of receipt and Expenditure |
Who can Conduct the pre - Construction planning & Design of Irrigation Projects |
Who can conduct the short term courses for officer recruited in the class 1 & 2 cadres |
How much years of continuous service of Daily wages labour is required for sanctioning The Terminal gratuty |
What symbol is used for labour present in the morning and also in the evening |
What is the rate of earnest money deposit to be recovered from the contractor for tendering above 1 crore to 2 crore |
On what basis schedule of red shall be prepared |
What scale of percentage should be adopted for the security deposit to be taken from the contractor for earthwork over Rs. 1 lakh. |
Who will scrutinise the rate of extra item before they are accepted & sanctioned |
Which conditions is applied to levy the compensation on the contractor as per B1 tender |
When the sanction of ordinary repair estimate lapses |
Which condition is applied to sanction the revised rate of the execution of excess quantity more than 125% |
Which contract The detailed measurements are not required to be recorded |
Which condition is applied to Grant a extension to the contractor as per B1 tender |
Which clause of B1 tender is not an abitration clause |
When the sanction of M&R estimate should invariably be communicated to the audit office |
Which item should not be got executed from the contractor on Oral order or inanticipation of the sanction |
What is the minimum amount of earnest money deposit to be recovered from the contractor for the work costing more than 1 Cr. |
Who will can done the rule of contract or departure from the rule |
What symbol is used for daily wages worker for present in the morning and absent in the evening |
What is the time limit for acceptance of tender at executive level |
Which authorities the fatol & serious non fatol accident should be reported |
How much days are allowed for female worker who undergo non purposal situation |
When the fairy boats are inspected by the Executive Engineer |
What scale of percentage should be adopted for the security deposit to be taken from the contractor for other work costing over Rs. 1 Lakh |
Who will approve the site of storing magazine |
Who will identity the owner for payment of Rental compensation |
What is the time limit for acceptance of tender at superintending engineer level |
Where the application for installation of petrol pump in project site is to be made |
When the land is required for the public purpose which officer in the first instant should be consulted |
What is the rate of Crop compensation to be granted as per the approvement market value |
Which officer is to be reported the interraption of large work in progress along with the cause & duration |
What symbol is used for daily wages labour for absent in the morning and present in the evening |
What preposition of cost is adopted while constructing the metre gauge Railway bridges |
What proportion of cost is adopted while constructing new board gauge bridges (1.67mtr) of Railway |
Which Agencies or association the fishing right to be given |
How the fishing right is to be given |
Where the royalty fee for road metal obtained from the departmental quarries should be executed |
How much supervision charges are to be recovered when the stock material sold to the public |
What rate of depreciation is adopted in case of road metal |
What is the preservation period of arrears of wages |
What symbol is used for full day absent of daily labour |
Which from is used for maintaining account of material at site |
What is the time limit for acceptance of tender at chief engineer levels |
Where the provision of supply of material is made in the B1 agreement |
What rate of depreciation is to be adopted for pools |
What is the preservation period of award statement |
Which form is used for preparation and submission of workship to the higher authorities |
What rate of depreciation is to be adopted for camp equipment |
Which authority is to be conducted the test of excavated material from the site of dam |
What rate of depreciation is to be adopted for engine oil |
What scale of fee should be charged in case of valuation of private building required on the basis of Detailed survey upto Rs. 5000 |
What is the preservation period of equiptance role of scarcity |
What rate of depreciation is to be adopted for electric heating appliances |
Who will inspect the boiler ? |
Who will supply the methomaterial and scientific equipment to all divisions as per requirement |
What is the preservation period of agreement with contractor |
Who will competent the Write confidential report of the contractor |
What rate of depreciation is to be adopted for water pump |
How much govt. workshop are situated under the control of irrigation Department |
How much govt. residence of the Governor in the state of Maharashtra |
What is the preservation period of canal return |
Which form is used for obtaining the material from Central Store |
Which form is used for rectification of errors in recorded transaction of account |
What is the preservation period legal affairs Csuits |
How much period is required for converting the daily wages labour on CRT establishment |
What is the preservation period of measurement books |
The field levels are taken in which books |
Which form is used for recording the measurements of stock material |
Central design organisation is created in which year |
Which is the item rate contract |
Which rate is adopted for execution of extra item |
Who will prepare the plans of the monumental building/ structure |
Which year the engineering stop college presently engineering training academy is established |
What is the preservation period of Register of interest bearing securities |
What is the financial Eligibility of class 3 contractor for tendering the work |
Which is the documents used for interesting security |
Which clause of B1 tender is operated for the excess quantity executed by the contractor for revised rate |
What is the financial Eligibility of class 6 contractor for tendering the work |
Which unit is operated for measuring the work of Dewatering during excution |
How much members are in the public account committee |
What is the financial Eligibility of class 7 contractor for tendering the work |
Where the emoluments and allowances of governor are to be classified |
What power are delicated to the S.E. to accept the tender of civil work |
Which head of account the EGS expenditure is to be debited |
What is the age limit for employment of labour on department work |
Which agency is tackled the engineering research problem |
Who will issue the tender notice for Publication in newspaper |
How much parts the CSR /DSR is maintained |
Who will approve the rate analysis of reduce rate of the contractors bill |
Which cost is considered in calculation of depreciation of articles |
Who will Undertaker the maintenance and repairs of heavy Earth moving machinery |
Where the central design organisation is situated |
Which authority is the losses of store should be reported by the Executive Engineer |
Which form of agreement is to be used for department execution of work |